Number Address Description Status Issued Date
24-280852 EC 301 Vaughan Street Other Electrical. YMCA building. Replace existing 2x4 347V ceiling light fixtures (6 T5 fluorescent bulbs each, 324W) with 24 high bay 347V 240W 5000K LEDs light fixtures at gym area ceiling.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2024-12-31
24-177989 EC 301 Vaughan Street Other Electrical. Replace 1 for 1 fluorescent T-bar fixtures with new LED fixtures
Issued Issued: The permit has been issued. All applicable plan review processes have been completed. Construction may have begun and inspections may have been performed. There may or may not be identified defects.
2024-06-24
22-113532 EC 301 Vaughan Street Rewire. Install 14 new led High Bay pool lights with defusers
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2022-02-10
20-123282 EC 301 Vaughan ST Other Electrical. Swap intrusion panel and move to new location and install additional burg devices. ABM200047
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2020-03-23
18-179289 EC 301 Vaughan ST Other Electrical. Install Projector and Speakers in Spin room 3rd floor
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2018-11-06
18-176657 EC 301 Vaughan ST Other Electrical. YMCA Electrical alteration to Bike Studio 5th Floor. Install 2 circ. fans, 10 lights, 3 switches, 4 receptacles, & Audio Equipment
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2018-10-23
18-120642 PC 301 Vaughan ST Plumbing Repair. replaced existing 4" premise isolation backflow devices Serial # 174104 Manufacturer Watts Model# 909 Type of Assembly RP Size 4" Location os assembly Basement Maintenance shop Type of equipement protected Premise isolation also removed Serial #221463 Manufacturer Watts Model# 909 Type of Assembly RP Size 4" Location of assembly Basement Mechanical room Type of equipment protected Premise Isolation replaced with new Serial # 20466 Manufacturer Watts Model# LF909 Type of assembly RP Size 4" Location of assembly Basement Maintenance shop Type of equipment protected Premise Isolation . new Serial # 19883 Manufacturer Watts Model# LF909 Type of Assembly RP Size 4" Location of assembly Basement Maintenance room Type of Equipement Protected Premise Isolation device Upon installation of Backflow Prevention devices
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2018-04-16
17-155056 MC 301 Vaughan ST M1 - HVAC. Location of work within bldg - unit/suite/rm #/flr: 1. Related Building Permit Number/Year: 153451-17 RE. M1 Permit for general HVAC ductowrk - Complete install.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2017-09-05
17-153499 EC 301 Vaughan ST Wire Building Alteration. Related Building Permit: 17 153451 RE. Interior alterations
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2017-09-12
17-153451 RE 301 Vaughan ST Interior Alteration. YMCA/ YWCA of Winnipeg - Interior alterations to include demolition of existing partition walls and construction of new partition walls for two meeting rooms, two offices and a staff room. Mechanical and electrical work being done.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2017-09-12
17-131376 RE 301 Vaughan ST Main Floor Structural Alteration. YMCA/ YWCA of Winnipeg - Structural alteration to the men's shower area to include concrete repairs and tiling work.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2017-06-14
17-118191 EC 301 Vaughan ST Additional Wiring.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2017-03-27
16-145280 EC 301 Vaughan ST Wire Building Alteration. Related Building Permit Number / Year: 16131160. Renovation of existing lobby
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2016-07-21
16-142685 MC 301 Vaughan ST M1 - HVAC. Related BP number 16-131160 RE General HVAC
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2016-07-18
16-131160 RE 301 Vaughan ST Interior Alteration. YMCA - Interior alterations to the main floor of an existing recreation facility building. Work includes new wall cladding, millwork, door penetrations, and pedestrian control equipment. Structural work includes new door penetrations in existing masonry walls. Mechanical and electrical work being done.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2016-06-29
16-125058 EC 301 Vaughan ST Communication Systems. New data system. Fibre cables, data drops, plugs and cabinets.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2016-05-12
14-144362 EC 301 Vaughan ST Wire Building Alteration. Related Permit 14 117890 RE renovating existing washroom into office area
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2014-08-05
14-117890 RE 301 Vaughan ST Interior Alteration. YMCA - Phase 1 - Interior alterations to an existing recreation facility. Work to include conversion of an existing change room on the 2nd floor to a youth drop-in room.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2014-05-30
14-105624 EC 301 Vaughan ST Repair. Replacing Fire Alarm Panel Only - no new wiring.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2014-01-29
10-126681 EC 301 Vaughan ST Wire Building Alteration. Related Building Application # RE 109529 / 10.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2010-05-14
10-124284 PC 301 Vaughan ST Plumb Building Alteration. Related Building Application # RE 109529 / 10.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2010-05-03
10-109529 RE 301 Vaughan ST Interior Alteration. Downtown YM-YWCA - Interior alterations to include renovations to change a locker room into a family locker room.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2010-04-27
10-107958 EC 301 Vaughan ST Other Electrical. POWERSMART FIXTURES.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2010-02-18
10-103985 PC 301 Vaughan ST Plumbing Repair. Install backflow
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2010-01-25
10-101671 MU 100 The Promenade (Fred Douglas Heritage House) Interior Alteration. Interior alterations to portions of floors 3, 4, 5 and 6 of a Commercial building. Install magnetic locks to existing doors.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2010-10-22
09-153251 EC 301 Vaughan ST Other Electrical. POWERSMART.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2009-09-22
08-146761 RE 301 Vaughan ST - YMCA/ YWCA of Winnipeg Alter Exterior. Exterior alterations to an existing 6 storey recreational/ residential building. Replace the 10 ft portion of an existing (former)chimney that extends beyond the 6th storey. Repoint the entire chimney ( now an air duct).
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2008-11-27
08-113233 EH 301 Vaughan ST Change of Use. Downtown YM-YWCA Before and After School Age Program - Occupancy for an existing day care expanding to the 4th floor of an existing building.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2008-06-02
08-102853 EC 301 Vaughan ST Other Electrical. City of Winnipeg new illumenated transit sign wired into hydro street light
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2008-01-11
06-137370 RE 301 Vaughan ST (YM-YWCA - Women's Locker Rooms) Interior Alteration. Interior alterations for an existing tenant of an institutional multi use building for the YM-YWCA. Alterations include the installation of new flooring in the womens locker rooms located on the mezzanine, main and second floors.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2006-06-29
05-149349 EC 301 Vaughan ST (YM-YWCA) Other Electrical. Additional lights & plugs. Related Building Application # EC 133464 / 05
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2005-09-07
05-133464 EC 301 Vaughan ST (YM-YWCA) Wire Building Alteration. Related Building Application # PI 129872 / 05
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2005-07-11
05-129872 PI 301 Vaughan ST (YM-YWCA) Interior Alteration. Interior alterations and occupancy for an existing tenant of a multi use building for the YM-YWCA. Alterations include installation of a new wheelchair lift, expanding the third floor mezzanine, remove interior partition walls on the fourth floor, mechanical and electrical work.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2005-06-22
02-242686 OP 301 Vaughan ST (Y.M.C.A.) Interior Alteration. Y.M.C.A. - Interior alterations for an existing tenant on the second floor of an Institutional Multi Use building. Alterations to include removing existing reception desk and millwork and construct a wall with glazing and painting.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2002-09-25
02-215557 ES 301 Vaughan ST (YMCA) Wire Sign. Parent Folder # 01 155243 SP
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2002-03-20
01-155243 SP 301 Vaughan ST (YMCA) Erect. YMCA - Erect a 6 ft in diameter Projecting Sign.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2002-01-18
01-148670 EC 301 Vaughan ST Additional Wiring. YMCA - Install two receptacles.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2001-02-22
00-156219 EH 301 Vaughan ST Occupy Only. Downtown YM-YWCA Before and After School Age Program--30 children ages 6 to 12 years to be located in the downtown Y 2nd floor.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2000-07-31

 

Start Over


In the case of all closed permits, the City retains the authority to engage with the current property owner regarding issues of non-compliance with building and electrical codes, and other building or zoning by-law requirements. However, in terms of the requirements associated with the permit process itself, the City considers these requirements to have been met at the time of the closure. That is, while the City could engage with subsequent enforcement action in a situation where a clear building code violation continues to exist, the City would not engage in enforcement action for 'work without a permit', for example, when that work was clearly performed under the permissions of a permit that was subsequently closed.

 

More Information

Questions about permit searches? Read our Frequently Asked Questions.

Don't see your building or trade permit? For this and other general inquiries call Permits Direct Line at 204‑986‑5140 or email ppd-permit@winnipeg.ca.

Don't see your development permit? For this and other general inquiries call Permits Direct Line at 204‑986‑5140 or email ppd-zoningapplications@winnipeg.ca.

To request copies of archived building plans or closed permits, contact the Central Files Office.

For a file-based search of existing records to determine if any orders, violations, active permits, etc. are present on an existing structure, email centralizedpropertyfilesearch@winnipeg.ca.

Use of this site signifies your agreement to the Conditions of Use.