Winnipeg Logo

Search for Issued Construction-Related Permits

Permits for 120 Saunderson Street
For information on permit search results and terminology, see Frequently Asked Questions.


Number Address Description Status Issued Date
26-143947 SP 120 Saunderson ST Erect. Erect 3.5' wide x 8.75' high double-sided free-standing sign for University of Manitoba's Prairie Crops and Soils Research Facility.
Issued Issued: The permit has been issued. All applicable plan review processes have been completed. Construction may have begun and inspections may have been performed. There may or may not be identified defects.
2026-04-27
26-133757 MC 120 Saunderson ST M2 - Fire Sprinkler System. Location of work within building - room number, floor, etc.: 120 Saunderson St. Related Building Permit: 25 162736 000 00 MP. This project consists of designing and installing a new wet sprinkler system and backflow preventer for a new 1-storey architectural research facility in Winnipeg, MB. The starting point of installations is the incoming flange inside mechanical room 126 by others. Manitoba Class F3. Ref: 25 162736 000 00 MP
Issued Issued: The permit has been issued. All applicable plan review processes have been completed. Construction may have begun and inspections may have been performed. There may or may not be identified defects.
2026-05-11
25-265080 EC 120 Saunderson ST Additional Wiring. Related Building Permit: 25-162736 MP. Low voltage HVAC controls P210083
Issued Issued: The permit has been issued. All applicable plan review processes have been completed. Construction may have begun and inspections may have been performed. There may or may not be identified defects.
2025-11-28
25-261698 EC 120 Saunderson ST Wire New Building. Related Building Permit: 25-162736 MP. wire new building c/w 25kv exterior transformer, 600v incoming main power, lighting, outlets, equipment, fire alarm, data, card access, fiber and CCTV
Issued Issued: The permit has been issued. All applicable plan review processes have been completed. Construction may have begun and inspections may have been performed. There may or may not be identified defects.
2025-11-24
25-241502 PC 120 Saunderson ST Plumb Building Addition. Related Building Permit: 25-162736 MP. Location of work within building - room number, floor, etc.: mechanical room. Back flows with test cocks Upon installation of Backflow Prevention devices
Issued Issued: The permit has been issued. All applicable plan review processes have been completed. Construction may have begun and inspections may have been performed. There may or may not be identified defects.
2025-10-22
25-241471 MC 120 Saunderson ST M1 - HVAC. Location of work within building - room number, floor, etc.: all. New construction
Issued Issued: The permit has been issued. All applicable plan review processes have been completed. Construction may have begun and inspections may have been performed. There may or may not be identified defects.
2025-10-17
25-241446 PC 120 Saunderson ST Plumb New Building. Related Building Permit: 25-162736 MP. Plumbing for new industrial building at the University of Manitoba
Issued Issued: The permit has been issued. All applicable plan review processes have been completed. Construction may have begun and inspections may have been performed. There may or may not be identified defects.
2025-10-22
25-239076 EC 120 Saunderson ST Temporary Installation. Temporary power for new construction site, fed off of permanent 600V power in the neighboring building. Includes 100A 600V breaker feeding 100A 600V splitter for potential future expansion, downstream 60A disconnect, 45KVA transformer and 200A rated 120/208v panel.
Closed Closed: The permit is closed. Construction and required inspections have been completed and any outstanding defects have been addressed. Audit program permits are included in this category. Permits in an audit program may not have had all standard inspections performed as a result of a more formal audit inspection process which allows for fewer inspections for builders/contractors who have a history of compliant construction.
2025-10-15
25-162736 MP 120 Saunderson Street Construct New. "Concurrent Building Permit Submission"-University of Manitoba- Construct a 1 storey, 2100sqm industrial building (industrial research facility building) with covered outdoor work-yard. (Related DP:- 25-159026 DP)
Issued Issued: The permit has been issued. All applicable plan review processes have been completed. Construction may have begun and inspections may have been performed. There may or may not be identified defects.
2025-08-08
25-159026 DP 120 Saunderson Street Permit. The Prairie Crops and Soils Research Facility at the UofM Fort Garry Campus - Development permit for the construction and site development of a new 18815 sq. ft. industrial research facility building.
Issued Issued: The permit has been issued. All applicable plan review processes have been completed.
2025-08-08

 

Start Over


In the case of all closed permits, the City retains the authority to engage with the current property owner regarding issues of non-compliance with building and electrical codes, and other building or zoning by-law requirements. However, in terms of the requirements associated with the permit process itself, the City considers these requirements to have been met at the time of the closure. That is, while the City could engage with subsequent enforcement action in a situation where a clear building code violation continues to exist, the City would not engage in enforcement action for 'work without a permit', for example, when that work was clearly performed under the permissions of a permit that was subsequently closed.

 

More Information

Questions about permit searches? Read our Frequently Asked Questions.

Don't see your building or trade permit? For this and other general inquiries call Permits Direct Line at 204‑986‑5140 or email ppd-permit@winnipeg.ca.

Don't see your development permit? For this and other general inquiries call Permits Direct Line at 204‑986‑5140 or email ppd-zoningapplications@winnipeg.ca.

To request copies of archived building plans or closed permits, contact the Central Files Office.

For a file-based search of existing records to determine if any orders, violations, active permits, etc. are present on an existing structure, visit Centralized property file search | City of Winnipeg.