Number Address Description Status Issued Date
26-114825 MU 72 Israel Asper Way Construct New. Housing Accelerator Fund OPCP Construct a Mixed Use (79, 409 sq*ft) 6 Storey Apartment Building (91 Dwelling Units) with 4 Shell Only Retail Units on the Main Floor.
Issued Issued: The permit has been issued. All applicable plan review processes have been completed. Construction may have begun and inspections may have been performed. There may or may not be identified defects.
2026-02-12
25-139621 DP 72 Israel Asper Way Permit. Housing Accelerator Fund - Development Permit Application for a proposed two building, 79,409 sq. ft. 6-storey mixed-use development containing a 91-unit Multi-Family Dwelling Use and 4 Commercial Rental Units located on the main floors. The two buildings are connected by outdoor walkways at each level and building A has a roof top patio amenity.
Issued Issued: The permit has been issued. All applicable plan review processes have been completed.
2025-12-09
23-123681 DP 1 Forks Market Road/ Israel Asper Way Permit. The Forks Renewal Corporation- Development permit to facilitate the installation of the water, waste water, and land drainage infrastructure required to service the first phase (Railside South) of the planned Railside development.
Issued Issued: The permit has been issued. All applicable plan review processes have been completed.
2023-07-21

 

Start Over


In the case of all closed permits, the City retains the authority to engage with the current property owner regarding issues of non-compliance with building and electrical codes, and other building or zoning by-law requirements. However, in terms of the requirements associated with the permit process itself, the City considers these requirements to have been met at the time of the closure. That is, while the City could engage with subsequent enforcement action in a situation where a clear building code violation continues to exist, the City would not engage in enforcement action for 'work without a permit', for example, when that work was clearly performed under the permissions of a permit that was subsequently closed.

 

More Information

Questions about permit searches? Read our Frequently Asked Questions.

Don't see your building or trade permit? For this and other general inquiries call Permits Direct Line at 204‑986‑5140 or email ppd-permit@winnipeg.ca.

Don't see your development permit? For this and other general inquiries call Permits Direct Line at 204‑986‑5140 or email ppd-zoningapplications@winnipeg.ca.

To request copies of archived building plans or closed permits, contact the Central Files Office.

For a file-based search of existing records to determine if any orders, violations, active permits, etc. are present on an existing structure, email centralizedpropertyfilesearch@winnipeg.ca.

Use of this site signifies your agreement to the Conditions of Use.